Costs, contractors, and paying
How to hire a CAPS remodeler
CAPS is a training credential from NAHB, not a license and not a clinical title. Verify the license, the insurance, and the scope in writing.
A Certified Aging-in-Place Specialist is someone who has finished a short course sequence from the National Association of Home Builders and kept the credential current. The courses cover how to talk with clients, how to think about design for daily tasks, and how to detail the work in an occupied house. That training is useful. It is not a state contractor's license, not an occupational therapy license, and not a promise that the person holding the card is the right builder for a structural job. Hire the credential as one filter. Hire the license, the insurance, and the written scope as the actual filters.
NAHB describes the credential as three courses: marketing and communicating with the aging-in-place client, design concepts for livable homes, and details and solutions. Designers, occupational therapists, realtors, and remodelers all take it. Seeing "CAPS" on a card tells you the person sat through that curriculum and applied for the designation. It does not tell you they have framed a bathroom. Ask what they build with their own crews.
What to verify before the first meeting
Confirm the credential is current. NAHB's own pages explain the education and the renewal rules, including continuing education. Ask the designer or remodeler for the name the credential is under and check with NAHB or the local home builders association if you cannot tell a real card from a logo in an email signature. Credentials lapse. A lapsed card is a talking point, not a qualification.
Confirm the state or local contractor license for the trade you are hiring. A handyman exemption that allows small jobs may not cover a bathroom rebuild, a ramp with footings, or electrical work. The license board in your state, not the contractor's website, is the place to look. Ask for a certificate of liability insurance and for workers' compensation if crews will be on the property. NAHB's own CAPS graduation requirements for remodelers mention insurance and a business license where the state requires one. Get the certificates sent from the insurer, not a blurry photo of last year's paper. If a subcontractor will do the plumbing, the electrician's work, or the tile waterproofing, ask who holds that license. "We have a guy" is not a license.
Call two recent clients whose projects resemble yours: a bathroom with a curb removed, a ramp, a door widening, not a kitchen facelift. Ask whether the crew showed up, whether the change orders were explained before the work, whether the house was livable at night, and whether anything leaked later. You are listening for the waterproofing and the schedule, not for the adjective "nice."
The meeting in the house
Give the contractor the photo list from the house walk, not a request to "make it safe." A CAPS-trained person should be able to walk the night route with you and talk about blocking, thresholds, and door swing without jumping to a full gut. If the first meeting is a single price for a vague accessible bathroom, end it. You want a scope.
Ask who will coordinate with an occupational therapist if you have one. The therapist's visit produces recommendations. The builder produces a structure that matches them. Those are different jobs. A builder who dismisses the therapist, or a therapist who never looks at the wall cavity, leaves you to reconcile the conflict in the middle of demolition. Better to introduce them on paper before the tile is ordered.
Ask what the house will be like during the work. An occupied-home remodel needs a working toilet at the end of every day, a dry path to it, dust controlled, and the resident's chair and medications unmoved unless you agreed to the move. Write the daily shutdown rule into the contract. A crew that leaves a bathroom gutted over a weekend without a backup toilet has made the house less safe in the name of safety.
Permits are the contractor's job to name. If the work includes a new circuit, a structural header, a ramp footing, or an egress window, ask which permits and inspections apply. An unpermitted bathroom is a problem at resale and a problem if a waterproofing failure needs an insurance conversation. The cost guide shows how a bid should list those items instead of burying them.
The paper
A usable proposal names the rooms, the measurements, the products where they matter (membrane system, valve type, door size, grab-bar blocking), the allowances for fixtures you have not chosen, the payment schedule, and the change-order rule. Payment in full up front is a bad trade. A deposit, progress payments tied to work you can see, and a final payment after the flood test or the inspection is a sane trade. Lien waivers from subs, where your state uses them, keep you from paying twice.
Change orders happen because walls contain surprises. The rule you want is written: no extra work without a price you accepted first, except an emergency stop for an active leak or a safety hazard. "While we were in there" is how a modest grab-bar job becomes a remodel you did not choose. Sometimes the surprise is real and you should expand the job. You should expand it on purpose.
Get two or three proposals on the same scope. If one is far cheaper, look for the missing membrane, the missing electrical, the missing haul-away, or the missing permit. Cheap and complete is rare. The dated cost ranges in the cost guide exist so you can see the spread, not so you can hand a contractor a number from 2015 and demand it.
Red flags
Walk away or slow down if
- The CAPS card cannot be tied to a current record, or it is offered as a substitute for a license.
- Insurance will not be sent from the insurer. License numbers cannot be found on the state board site.
- The price is a single line, or the contractor will not walk the night route.
- You are pressured to sign during the first visit or to pay most of the money before demolition.
- Waterproofing, inspections, and the temporary toilet are "not a big deal."
- The only references are family members or projects you cannot visit or call.
A reasonable hire looks like
- Current credential, current license, insurance certificates, two similar clients you spoke to.
- A scope that quotes your measurements back to you.
- A schedule that leaves you with a toilet and a lit path every night.
- A change-order habit you saw in the references, not only in the brochure.
Ask one scheduling question the references sometimes forget: who is on site, and how you reach them the day a toilet will not flush. A project manager who only answers email at night is a problem in an occupied house. Get a phone number that works during work hours, and say in the contract that the resident's single bathroom is put back in service before the crew leaves, even if that means a plywood cover and a working flange rather than a finished look. Finish can wait a day. Toileting cannot.
CAPS is worth asking for because the person has at least been taught to look at reach, blocking, and occupied-home work. It is not worth paying a premium for if the scope is vague and the license is missing. The National Association of Home Builders is clear that the designation is an education credential in a remodeling market. Treat it that way, and keep the state's licensing board on the other tab of the browser.
Sources
- National Association of Home Builders, Certified Aging-in-Place Specialist and how to earn CAPS.
- National Institute on Aging, Aging in place.
- U.S. Access Board, 2010 ADA Standards, the measurement benchmark a serious scope will acknowledge.
- CDC STEADI, Check for Safety.
- AARP, HomeFit Guide.